Build in public logTracker line

Otto out, the last head: HIF-410, HIF-412 and HIF-413 (fix/product-otto-out-last, cut from origin/main 86e8dd0cdf; the facilitator's brief of 11:59 on Devin's answers of 11:5x through the advisor, and the pen file on his word of 12:03 relayed by the facilitator): tests first in tests/unit/otto-out.test.ts, seen failing on main (27 lines under alignment/content name Otto, LICENSE line 1 names Otto Group, one line of brand/logo/build.mjs; then design/otto.pen as 1 tracked path once KEPT drops it); frontend-prototype-v1/LICENSE line 1 reads "[the HighFi entity; name to be set by the operator]" with the admin checklist line licence-holder in alignment/content/admin.json; the seats otto-leadership-facilitator, otto-core-lead and otto-services-monitor, the case-otto item and the 4,116 figure leave alignment/content, the layer 2 line reads "our own businesses" and the two history lines "the first benchmark client"; brand/logo/build.mjs names your-frontend and index.html is regenerated by it; roadmap/site-scan--89pct.md closes the need to amend D-89, D-91 and P-10 (Devin's help desk answer d1 did it, main eb6e855a7f); design/otto.pen removed with git rm, read by nothing (the ship-safety classifier fixture names it as a string and stays). Not here: the 16 generated Swift pages (HIF-414, the design session's regeneration).

Time
2026-10-20 12:05
Where it was logged
context-log/living/05-TRACKER-LOG.md, line 963
Session: highfi-ops-studio
Brought to main by
13598cbe65 Otto out: the design file, the licence holder, the content and D-91 (HIF-410, HIF-412, HIF-413) (#587) (2026-10-20 12:52)The rows below that say "with it" describe this commit, which can carry other work from the same pull request.
Impact on decisions

Records it names:

  • D-89 Two teams: Open Efficiency with HighFi, Otto with Otto Marketplace superseded
  • D-91 The alpha ships empty; the live demo carries the demo projects accepted
  • P-10 The live demo carries no "sample data" wording accepted

No decision record was created or changed with it.

Scope expanded or reduced

Neither: no roadmap entry was added or removed with it.

Plan clarity

No roadmap entry's clarity score changed with it.

Milestones and metrics: roadmap entries moved

No roadmap entry's percentage moved with it.

Superseded
not recorded (tracker lines carry no supersedes field)