Build in public logTracker line

Where we are without a date (feat/services-site-where-we-are-belt, cut from main a15ba4387e; Devin's fast-track of 2026-10-15, the facilitator's line of 20:01 with the advisor's conditions): the heading keeps its label and loses only the date; the fidelity meter and its criteria stay; under them the roadmap's done figure (the Overall ROADMAP.md prints, 66 percent across 52 entries today, read at build time through roadmap/lanes.mjs readEntries and overallPercent) and a belt of the MVP core set as roadmap/checkin.mjs --core picks it, nine entries, each by its own title, Shipped or In progress with its percent in words, linking to its entry at /alignment#ri-<slug>. The belt scrolls in 60 s, stops under the pointer or the keyboard, and stands still and wraps under reduced motion; its second copy is hidden from assistive technology and out of the tab order. site/where-we-are.mjs; pinned by tests/unit/site-where-we-are.test.ts (failed on the missing module first) and frontend-prototype-v1/scripts/site-home-check.mjs (10 failed on main's build first), which now parks the pointer before every picture.

Time
2026-10-15 20:11
Where it was logged
context-log/living/05-TRACKER-LOG.md, line 896
Session: highfi-services-site
Brought to main by
7b7e248504 Train of 4 heads: Licence: paste a key in Settings; a test key reads as a test key; Ship queue: a runner that ends on a network stop starts again by itself; Site: a Where we are belt, one big figur... (#545) (2026-10-17 05:13)The rows below that say "with it" describe this commit, which can carry other work from the same pull request.
Impact on decisions

Names no decision record.

No decision record was created or changed with it.

Scope expanded or reduced

Neither: no roadmap entry was added or removed with it.

Plan clarity

No roadmap entry's clarity score changed with it.

Milestones and metrics: roadmap entries moved

No roadmap entry's percentage moved with it.

Superseded
not recorded (tracker lines carry no supersedes field)