Build in public logContext log entry · notes

Insights from Lenilson's PR #12 (overnight design expansion), carried forward

Source: github.com/lenilsonjr/highfi/pull/12 (design/overnight-expansion, 10 commits, 2026-10-05, product.pen only), its description and commit messages; the linked Linear doc "Overnight design expansion — review and decisions" (P-HIF-30) is not reachable from this workspace. The frames themselves are outdated against the design session's product.pen (operator, 2026-10-06), so the PR is closed unmerged; the ideas below are what we keep. Each one is now a roadmap Next line and part of a design brief.

Time
2026-10-06 22:00
Where it was logged
context-log/2026-10-06_2200_dev-not-dev_insights-from-pr-12-overnight-expansion.md
Session: not recorded
Brought to main by
b9e1c03fa8 Merge pull request #15 from lenilsonjr/feature/site-links-and-pr-status (2026-10-06 13:48)The rows below that say "with it" describe this commit, which can carry other work from the same pull request.
Impact on decisions

Records it names:

  • D-84 Framework adapters, detected on import; React and Next.js and Rails first, Swift and Flutter next accepted

Records created or changed with it:

  • changed: D-86 Every branch deploys the site to a semantic Vercel URL (personal account, OpenVentures, project highfi)
Scope expanded or reduced

Neither: no roadmap entry was added or removed with it.

Plan clarity

No roadmap entry's clarity score changed with it.

Milestones and metrics: roadmap entries moved

No roadmap entry's percentage moved with it.

Superseded

Not superseded (status: active).